Woodside Julimar Phase 3,
Lambert West, and Xena 3 – Supply of Stabilisation Sandbags
Project Overview
The Julimar Phase 3, Lambert West, and Xena 3 projects required stabilisation sandbags to secure hydraulic, electrical, and fibre optic flying leads after installation.
Technip FMC, our client, invited us to supply:
- "Saddle" type stabilisation bags
- Single sandbags with ROV handles
- 1TE and 2TE bulka bags to serve as temporary bollards
Oceanic Supply was selected based on our strong track record in providing stabilisation solutions for subsea applications.
Challenges
- The client specified that the stabilisation sandbags must be suitable for a 20-year subsea design life at water depths ranging from 130m to 193m.
Solution Delivered
Oceanic Supply successfully delivered a total of 800 stabilisation bags following the contract award.
- Bags were customized to meet project requirements.
- Our industry expertise and experience enabled us to meet the tight delivery schedule without compromising quality.
By leveraging our technical knowledge and efficient production process, we provided a reliable and long-lasting subsea stabilisation solution that met the client's needs.
Woodside Julimar Phase 3, Lambert West, and Xena 3 – Supply of Stabilisation Sandbags