Woodside Julimar Phase 3, Lambert West, and Xena 3 – Supply of Stabilisation Sandbags

Woodside Julimar Phase 3, Lambert West, and Xena 3 – Supply of Stabilisation Sandbags  


Project Overview

The Julimar Phase 3, Lambert West, and Xena 3 projects required stabilisation sandbags to secure hydraulic, electrical, and fibre optic flying leads after installation.

Technip FMC, our client, invited us to supply:

  • "Saddle" type stabilisation bags
  • Single sandbags with ROV handles
  • 1TE and 2TE bulka bags to serve as temporary bollards

Oceanic Supply was selected based on our strong track record in providing stabilisation solutions for subsea applications.

Challenges

  • The client specified that the stabilisation sandbags must be suitable for a 20-year subsea design life at water depths ranging from 130m to 193m.


Solution Delivered

Oceanic Supply successfully delivered a total of 800 stabilisation bags following the contract award.

  • Bags were customized to meet project requirements.
  • Our industry expertise and experience enabled us to meet the tight delivery schedule without compromising quality.

By leveraging our technical knowledge and efficient production process, we provided a reliable and long-lasting subsea stabilisation solution that met the client's needs.