Woodside Greater Enfield Project – Paddle Tool for Spooling
Project Overview
The Greater Enfield Development is a greenfield project located west of the company’s existing Enfield and Vincent assets. The development targets three oil accumulations:
- Norton-over-Laverda (NoL)
- Laverda Canyon (LC)
- Cimatti
Technip FMC, our client, engaged us to supply paddle tools to support their umbilical spooling operations in Le Trait, France. The key requirements included:
- Lightweight construction using wood.
- Fumigation compliance as per ISPM 15.
- Delivery to France within project timelines.
Challenges Faced
- Supply Chain Constraints:
- Sourcing from Australia was not feasible due to cost and lead time.
- We needed to identify a local supplier for efficient delivery.
- Material Limitations:
- Wood lacked the robustness needed for the operation.
- A stronger yet lightweight alternative material was required.
Solution Delivered
Oceanic Supply provided a bespoke paddle tool machined from polyethylene, reinforced with a steel tube handle.
- Lighter than wood, making it easier to handle.
- More durable, ensuring long-term usability.
- Successfully sourced and delivered locally, meeting project deadlines.
Our innovative approach enhanced operational efficiency while overcoming supply and material challenges.


Woodside Greater Enfield Project – Paddle Tool for Spooling